Laboratory with warehouse in the basement

Annunci gratuiti per privati e aziende cerca trova fai il tuo affare!

63

Stai guardando l'annuncio: Laboratory with warehouse in the basement

Umbria Perugia Todi Uffici e locali commerciali


Non trovi la cosa giusta prova anche annunci gratuiti per privati e aziende Umbria, inserisci gratis il tuo annuncio, per te anche servizio alta visibilità IN VETRINA*

Questo immobile viene venduto tramite asta online. Laboratory for sale with warehouse in the basement plus office on the ground floor, located in Todi (PG), viale Tiberina 49. The unit is part of a residential building on the first floor, ground, first and second floor and a body of factory built adjacent to the same at the level of the basement used as a warehouse (laboratory).The warehouse area located in the basement, consists of: laboratory, 2 warehouses, a porch (to be built), 2 closets and toilets. On the ground floor there is the entrance area located on the left façade of the property which leads to the various real estate units (part 92 sub 8, not part of this sale), except for the commercial space and a small office , the latter connected to the basement via an internal stairwell.The portion used as a warehouse is equipped with an electrical system, connection to the sewer pipe, to the water network. The portion that insists on the main building has a better level of finish than the warehouse.It should be noted that the extension to the second floor (sub 8, not part of this sale), made with the Building Permit 76-2010, was possible thanks to a volume recovery through the transformation of a portion of the local Laboratory of the basement in the portico with the redistribution of the infill walls of the same. To date, the works are not finished. The partial demolition of the laboratory infill and the redistribution of the partitions of the entrance area on the ground floor to allow access to the elevator were not carried out.In addition, it should be noted that for the continuation of the works it will be necessary to pay an oblation for the Late renewal of the building permit. It will therefore be necessary to draw up a new Building Practice for the reopening of the deadlines and carry out the unfinished works and conclude the approved works. In addition to a report of Castal Variation and draw up all the paperwork for the request for usability.Overall, t

Inserito: 2 anni fa alle 11:36
81.090,00€